Removal steps of Kosta UPS power supply
1. Self-check the UPS power supply and batteries of the relocated Costa Rica, and lay the battery connecting wires from the primary batteries to the new batteries.
2. Corstal UPS power is off, and the voltage is measured with a multimeter to confirm that the input and output are open and open.
3. Battery switch is closed.
4. Start removing input and output cables and connecting batteries.
Carry
1. The dismantled equipment is packed in paper shells. The spare parts are packed in sealed bags and labeled.
2. The dismantled UPS mainframe and batteries are transported separately.
3. Damping treatment. Put shock absorber pads on hydraulic vehicles to ensure that the vibration of equipment is reduced during transportation.
Installation of UPS Power Supply Host in Costa